Gas pipe to Level 1 kitchen area requires removal.
Ditto - gas is fed from ground floor and runs west to east within the ceiling joists to the neighboring flat.
Joists run north to south under proposed bathroom area. Shower & basin pipework to be dropped below joists in boxing in to entrance lobby.
Opening up shows large beam runs across area below proposed WC location.
Opening up shows masonry wall below WC waste location prevents drop down to corridor below. CVA propose extending waste to north to drop within boxing in to proposed corridor.
110mm waste pipe plus 12mm plasterboard boxing leaves corridor width of 930mm
Partition to existing bathroom has been removed to open up corridor
Boxing in to extractor fan has been opened up during partition removal
Kitchen fittings have been removed. School has requested to retain cooker and washing machine. B&H have relocated appliances temporarily.
Boxing in to ground floor corridor has been opened up to reveal kitchen stack and WC stack respectively. Both stacks to be reused.
Boxing in to bathroom wastes to be located above doorway. Light fitting to be relocated.
Ditto - gas is fed from ground floor and runs west to east within the ceiling joists to the neighboring flat.
Joists run north to south under proposed bathroom area. Shower & basin pipework to be dropped below joists in boxing in to entrance lobby.
Opening up shows large beam runs across area below proposed WC location.
Opening up shows masonry wall below WC waste location prevents drop down to corridor below. CVA propose extending waste to north to drop within boxing in to proposed corridor.
110mm waste pipe plus 12mm plasterboard boxing leaves corridor width of 930mm
Partition to existing bathroom has been removed to open up corridor
Boxing in to extractor fan has been opened up during partition removal
Kitchen fittings have been removed. School has requested to retain cooker and washing machine. B&H have relocated appliances temporarily.
Boxing in to ground floor corridor has been opened up to reveal kitchen stack and WC stack respectively. Both stacks to be reused.
Boxing in to bathroom wastes to be located above doorway. Light fitting to be relocated.