Opening up works to beam over proposed stair have been completed to allow HRW to make proposals for the treatment of the structure.
Opening up works to partition to entrance door have revealed a metal stud wall without any original timber posts.
A trial pit has revealed lose earth below a layer of concrete. Foundations to new load bearing wall to be either fed under concrete or laid after concrete is broken up.
Opening up works to partition to entrance door have revealed a metal stud wall without any original timber posts.
A trial pit has revealed lose earth below a layer of concrete. Foundations to new load bearing wall to be either fed under concrete or laid after concrete is broken up.